top of page

HAKUTO-R
PAYLOAD CAPACITY - TLI (Trans Lunar Injection)
X band for lander-Earth uplink and downlink. Wi-Fi and sub-Ghz communications between mobile payloads and lander.
PAYLOAD CAPACITY - TO ORBIT
30 kg
The second ispace mission will perform a soft landing and deploy a rover for surface exploration and data collection on the Moon.
60 kg
104 X 36.7 X 60.2 cm (per bay, 2 bays available)
3.0 W/kg, 28 VDC unregulated & 12 V, 5V regulated
1) ispace rover
The duration of nominal surface operations is 12 sunlit days
0 (Partner with Draper Laboratory in their CLPS mission. Not eligible to be Main Contractors yet)
PAYLOAD CAPACITY - TO SURFACE
PAYLOAD SIZE
POWER DISTRIBUTION (FOR PAYLOAD)
COST
COMMUNICATIONS AVAILABLE
MISSION PLAN
SHIP MANIFEST
MISSION OBJECTIVES
EXPECTED DURATION
FIRST AWARDED CLPS CONTRACT
TOTAL CLPS CONTRACT


Last Updated on August 2022
bottom of page