top of page

Nova-C
PAYLOAD CAPACITY - TLI (Trans Lunar Injection)
PAYLOAD CAPACITY - TO ORBIT
130 kg
5/31/2019
1000 kg
200W (per lander, average)
1) Lunar Vertex is among NASA’s Payloads and Research Investigations on the Surface of the Moon (PRISM) selections. It is a combination of stationary lander payloads and a rover that will make detailed measurements of the magnetic field, plasma environment and regolith properties
2) NASA's Cooperative Autonomous Distributed Robotic Exploration (CADRE) consists of mobile robots programmed to work as an autonomous team to explore the lunar surface, collect data, and map different areas of the Moon in 3D
3) ESA's MoonLIGHT retroreflector is a laser retroreflector, which reflects laser beams sent from Earth directly back from the Moon to receivers on Earth. This allows very precise measurement of the distances between the reflector and the ground station
4) Lunar Space Environment Monitor (LUSEM) uses a pair of apertures to detect high-energy particles on the lunar surface. LUSEM is managed by the Korea Astronomy and Space Science Institute (KASI) in South Korea
Possibly 14 Earth days on lunar surface
3
PAYLOAD CAPACITY - TO SURFACE
PAYLOAD SIZE
POWER DISTRIBUTION (FOR PAYLOAD)
COST
COMMUNICATIONS AVAILABLE
MISSION PLAN
SHIP MANIFEST
MISSION OBJECTIVES
EXPECTED DURATION
FIRST AWARDED CLPS CONTRACT
TOTAL CLPS CONTRACT


Last Updated on August 2022
bottom of page