top of page
SpaceRadar | Lander Details

SERIES-2 (ispace lander)

PAYLOAD CAPACITY - TLI (Trans Lunar Injection)

PAYLOAD CAPACITY - TO ORBIT

500 kg

The Series 2 lander aims to be the first commercial lunar lander to survive a chilly lunar night, and to deliver a suite of three NASA-sponsored science payloads.

07/2022

2000 kg

~ US $100 M per mission

1) LuSEE (a flight spare from the FIELDS instrument on the Parker Solar Probe)
2) Farside Seismic Suite (FSS) - to measure moonquakes
3) The Lunar Interior Temperature and Materials Suite (LITMS)

Up to 28 Earth days after landing

1

PAYLOAD CAPACITY - TO SURFACE

PAYLOAD SIZE

POWER DISTRIBUTION (FOR PAYLOAD)

COST

COMMUNICATIONS AVAILABLE

MISSION PLAN

SHIP MANIFEST

MISSION OBJECTIVES

EXPECTED DURATION

FIRST AWARDED CLPS CONTRACT

TOTAL CLPS CONTRACT

Last Updated on August 2022

bottom of page