1) Rashid lunar rover by the Mohammed bin Rashid Space Centre (MBRSC)
2) Solid-state battery test module by NGK Spark Plug
3) Transformable lunar robot by the Japan Aerospace Exploration Agency (JAXA)
4) AI flight computer by Mission Control Space Services, which will collaborate with the Rashid rover
5) Multiple cameras by Canadensys
6) Panels engraved with the names of HAKUTO crowdfunding supporters

MISSION DURATION

30 kg

The duration of nominal surface operations is 12 sunlit days

The Atlas Crater, 47.5°N and 44.4°E

104 X 36.7 X 60.2 cm (per bay, 2 bays available)

10 kg with Payload

53.5 X 53.85 cm

LANDER PAYLOAD CAPACITY TO SURFACE

LANDER PAYLOAD BAY SIZE

ROVER MASS

ROVER DIMENSIONS